Open topic with navigation
You can run Operation Times retrospectively, or in real time.
It depends on whether you select the Retrospective Posting check box on the Operation Times tab in the Works Orders settings.
What do you want to do?
Retrospective Posting
Real Time Processing
Reference
Operation times (WOP settings)
Go to top